Stick System Curtain Walling
A stick curtain-wall system forms the facade grid on site before the individual infill panels are installed.

Stick System Curtain Walling — assemble site-fitted mullions, transoms while glazing, with the pane type, safe handling and timing confirmed.
Setting out, access and the sequence of weathering details require careful coordination. The chosen system must suit the module arrangement and interfaces with the rest of the building.
The detail that matters
What is assembled at the building in this approach?
The principal vertical and horizontal frame members are erected before the individual glazed or opaque infills are fitted.
Before the work
is agreed.
What is assembled at the building in this approach?
The principal vertical and horizontal frame members are erected before the individual glazed or opaque infills are fitted.
Can it accommodate an irregular elevation?
A suitable system may allow varied modules, provided the approved design resolves their junctions and interfaces.
What should I include in this enquiry?
Provide the building address, elevation photographs and any system drawings or maintenance records. Identify the affected floor or bay, occupied areas and the access routes available for inspection or handling.
Stick System Curtain Walling by area
Select a place to view this service for that location. Please provide the postcode when you enquire.